1. PHUOC DONG INDUSTRIAL PARK LOCATION:
Phuoc Dong Industrial Park is located in Hamlet 5, Provincial Road 826B, Can Duoc District, Long An Province. Located in the strategic area of priority industrial development "Adjacent to Vam Co River", convenient traffic network:+ North: Adjacent to Provincial Road 826B, existing residential area along Provincial Road 826B and rice fields.
+ South: Adjacent to Vam Co River
+ East: Adjacent to Nuoc Man Canal
+ West: Adjacent to rice fields and existing residential - resettlement area.
TRAFFIC SYSTEM
* Traffic outside the Industrial Park:
- School: 1-2km from the Industrial Park
- General Hospital: 3km from the Industrial Park
- District and Provincial Administrative Center: 4-6km from the Industrial Park
- Bank: 3km from the Industrial Park
- Market, Commercial Center: 2-4km from the Industrial Park
* Main Road of the Industrial Park:
16m main road with 4 lanes, 8m internal road with 2 lanes, hot asphalt concrete and designed according to VN standards.
2. LAND USE PLANNING:
Total area: 128.8 hectares. Of which:1. Industrial park land: 92.39 hectares
2. Green land: 13.30 hectares
3. Technical infrastructure land: 1.45 hectares
4. Administrative - service land: 1.70 hectares
5. Traffic land: 20.04 hectares
3. PHUOC DONG INTERNATIONAL SEAPORT:
Area scale: 50ha1. Port length: 1.8km
2. Port width: 30m x 350m (phase 1)
3. Including 2 wharves with loading capacity: 20,000 DWT
4. Logistics warehouse: 2.43ha (expected to develop 16.5ha).
4. INDUSTRIES ATTRACTING INVESTMENT:
- Electronics, information technology, media, telecommunications industry (including stages according to the Project's closed production technology such as painting, spraying, electroplating, cleaning metal surfaces with chemicals, etc.);- Industry for manufacturing, repairing, assembling motorbikes, cars, tractors and other means of transport (including stages according to the Project's closed production technology such as painting, spraying, electroplating, cleaning metal surfaces with chemicals, etc.);
- Industry for manufacturing construction steel, steel pipes (including stages according to the Project's closed production technology such as painting, electroplating, cleaning metal surfaces with chemicals, polishing metal, etc.; no casting, no smelting);
- Industry for manufacturing wooden furniture, interior decoration; processing wood, wood chips from natural wood; construction materials (no cement production, no clinker production, no lime production); paints used in construction;
- Ceramic, glass, crystal industry;
- Chemical and plastic production industry; plastic products, paints;
- Textile and garment industry (no dyeing, no bleaching, no washing and grinding);
- Food, foodstuff, animal feed processing industry (no fresh ingredients); beverage production;
- Pharmaceutical production industry;
- Cosmetics, industrial chemical additives production industry;
- Sports and fitness equipment, toys, jewelry production industry;
- Office tools, supplies, equipment (excluding industries related to printing ink).
- Production of products serving agriculture; production, mixing of fertilizers (excluding pesticides);
- Electricity and solar power production and distribution industry;
- Production and distribution of gas, industrial gas, medical gas; hot water, steam, industrial steam (hot steam, thermally saturated steam);
- Center for research, development and application of technology.
- Advertising, displaying, introducing and trading products;
5. LAND RENTAL PRICE, MANAGEMENT FEE (VAT not included)
1. Land price: from 170 (Usd/m2/Term) - Not including: tax, fee.2. Management and maintenance fee: 0.05 (USD/m2/month)
3. Payment progress Deposit: 1 billion VND Within 10 days from the date of signing the Agreement, holding the land
Instalment 1: 5% of the contract value Sign the Land Lease Contract within 15 days (including deposit)
Instalment 2: 45% of the contract value Within 30 days from the date of signing the Labor Contract
Instalment 3: 45% of the contract value Within 90 days from the date of signing the Labor Contract
Instalment 4: 5% of the contract value Receive the Land Use Right Certificate, Expected 6 - 12 months from the date of signing the Labor Contract 4.
Interest support: The Investor supports 12 months of interest for 70% of the total contract value (including VAT)
- Bank loan: The Investor directly deducts from the payment amount of each corresponding payment period.
- No bank loan: Directly deducted from the 3rd payment (customers receive 100% of the total support value)
The investor supports customers:
- Free business establishment: Apply for investment certificate, business registration, seal, tax code.
- Register management staff.
- Consulting on DTM procedures, applying for construction permits, fire prevention and fighting approval...
- Preferential rental of transaction offices, split offices.
6. POWER SUPPLY SYSTEM:
- 110/22KV source – (16 plus 40)MVA- Capacity 31.35 MW
7. WATER SUPPLY SYSTEM
- Capacity 5,000m3/day and night. Can Duoc Water Supply Plant- Pipeline = 110 mm – 315 mm
8. WASTEWATER TREATMENT SYSTEM
- Wastewater treatment plant with capacity of 3,000m3/day and night; Enterprises internally treat wastewater to meet column B standards.- Industrial park wastewater treatment to meet column A standards according to QCVN 40:2011/BTNMT before discharging into the environment.
With the potential of its geographical location and convenient transportation system, renting land in Phuoc Dong Industrial Park is a strategic solution for developing businesses with the need to build factories near Ho Chi Minh City and neighboring provinces such as Long An...
Not only having the advantage of location, Phuoc Dong Port Industrial Park also has diverse rental areas, flexible payment methods and complete infrastructure. In addition, it is also fully equipped with professional services such as support for training and labor recruitment, specialized health care clinics, accommodation areas... and many other convenient services to ensure a stable production and business environment for businesses and a living environment for workers.
IMG PHUOC DONG JOINT STOCK COMPANY
Address: Hamlet 5, Provincial Road 826B, Phuoc Dong, Can Duoc, Long An, VietnamHCM: 6th Floor, Master Building, 41-43 Tran Cao Van, Ward Vo Thi Sau, District 3, HCMC
Tel: +(84 272) 3714 123, +(84) 931 318 681
Hotline: (+84) 911 998 606
Email: contact@imgphuocdong.vn